Scottish and Southern Electricity Networks 132kV Transmission Line
The 3-day helicopter installation of 140 double circuit PowerON composite transmission structures in Scotland
CORPOELEC Venezuela Double Circuit 115kV Line
The first installation of PowerON composite poles in Venezuela
Hydro One Woodpecker Solution
How to solve woodpecker problems with PowerON composite poles
NTE Helicopter Install of H-frame and 3 pole
The 90-second helicopter installation of a PowerON composite transmission H-frame in Norway
BC Hydro video
Review of composite pole and crossarm transmission solutions
Hydro One - RS Poles - Pole Cut
Composite pole focus on safety, logistics and reliability
CBC News Story
Composite material benefits with a focus on the strength and resiliency of RS’s PowerON poles