Lowest Logistics Cost Case Study
SUMMARY
Demonstrative transportation scenario:
- How many 60 ft. [18.3 m] CL 1 RS, steel, wood, and concrete poles can be shipped in a single truckload?
PROBLEM
With single-piece poles, especially those over 60 ft. [18.3 m], larger equipment, highway escorts, over-length permits, and more truckloads are required to transport pole resources.
RS POLE SOLUTION
- RS poles are transported in compact nested bundles.
- Lightweight RS modules can be transported using standard trailers and equipment.
- Reduced transportation costs per pole.
- For 60 ft. [18.3 m] CL 1 poles, the RS pole’s nested design can ship 26 more poles than concrete; 13 more poles than wood; and 5 more poles than steel on every truck.